Commercial Roof Replacement Without the Operational Chaos
TPO, PVC, EPDM, modified bitumen, metal, and restoration coatings — specified to your building, phased around your operations, and closed out with the manufacturer warranty your asset deserves.
Replace, Recover, or Restore
Three Paths — Priced Honestly
- Full replacement — tear-off to the deck when saturation, multiple existing layers, or deck condition rule everything else out
- Recover — a new single-ply system over the existing roof where codes and core samples allow it; meaningful savings when conditions genuinely qualify
- Restoration coating — fluid-applied silicone or acrylic systems that add service life to a sound roof at a fraction of replacement cost
The right answer starts with core samples and a moisture survey, not a sales quota. If a coating buys you seven honest years, that’s the recommendation you’ll get — in writing, with the data.
Systems
What We Install
- TPO & PVC single-ply — heat-welded membranes for the broadest range of flat and low-slope buildings
- EPDM — proven rubber membrane for the right exposures and budgets
- Modified bitumen — multi-ply redundancy for high-traffic and equipment-heavy roofs
- Standing-seam & R-panel metal — long-life systems for institutional, industrial, and architectural applications
- Fluid-applied coatings — silicone and acrylic restoration over metal, single-ply, and mod-bit
- Tapered insulation & drainage correction — because ponding is a design problem, not a maintenance problem
How Commercial Projects Run
Built Around Your Building, Not Ours
Assessment & Core Data
Moisture survey, core samples, and deck evaluation produce a scope you can defend to ownership, lenders, or a board.
Tenant & Operations Plan
Phasing, staging, odor and noise windows, and access control planned with your facility team before mobilization.
Safety & Compliance
Documented safety program, protected entries, and daily site control — your occupants keep working while we do.
Manufacturer Warranties
Systems installed to specification by trained crews so the 20–30 year NDL-type warranties actually issue — and hold.
Insurance-Grade Documentation
For hail and wind losses, slope-by-slope evidence and itemized scopes that stand up in the claim — see how claims work.
Progress Reporting
Photo reports and schedule updates on a cadence your stakeholders can forward without editing.
Punch & Closeout
Final walk with your team, punch list closed, warranties registered, and the full photo record delivered.
Maintenance Handoff
A post-completion maintenance plan so the new roof reaches its design life — see roof asset planning.
FAQs
Owner & Facility Manager Questions
Can you replace the roof while the building stays occupied?
Recover or tear off — who decides?
What does a manufacturer warranty actually cover?
Our roof was hit by hail. Replacement or claim first?
Large-Loss & Multi-Site Capacity
Through the Solvane platform — including the RestoreMasters large-loss operation — crews mobilize for hurricane, hail, and catastrophe recovery on hotels, condominiums, schools, and industrial portfolios across 50+ markets.
Large-loss projects →Start With the Data
A documented assessment — photos, cores where warranted, and a written recommendation — costs you nothing and turns the replace-versus-restore debate into arithmetic.
Request an AssessmentYour Roof Is an Asset. Manage It Like One.
Assessments, honest recommendations, and manufacturer-warranted installations.